Fulton Park Seawall Restoration Project

Summary

The Town of Fulton increased the height of the erosion control along the 700 linear foot concrete seawall by two feet by utilizing the following construction techniques. A concrete walkway was constructed on top of the existing seawall and extend landward a distance of five feet onto the existing or filled sand. A 1.5 foot high retaining wall with a two foot wide "cap" was constructed on the walkway, and will provide a place for individuals to sit and enjoy the beauty of nature as they look out over the bay. Any wave action that overlaps the new wall will be captured and routed back to the drain inlets behind the wall and carried in underground drains back to the bay.

Basics

Aransas

N/A

Aransas County Navigation District

$100,000

Classification

CMP 306A

Waterfront Revitalization & Ecotourism Development

N/A



Funding Sources

Source 1

Completed

04-164

Coastal Management Program (CMP)

Primary

Federal

$60,000

07

2004

Source 2

Completed

04-164

Aransas County Navigation District

Secondary

State

$40,000

07

2004


Back to Grant Search

Links to Additional Resources

Contacts

General Land Office
Coastal Resources
800.998.4456
512.475.0773

Aransas County Navigation District
Mr. Ron Roe
Harbor Superintendent
911 Navigation Circle
Rockport, Texas 78382
361.729.5533
361.729.7029
Email