Page Content

Surfside Revetment Emergency Repair

Summary

Emergency repair to the western-most 950 feet of the 3,500 linear-foot rock revetment along the seaward right-of-way of Beach Drive due to damage from ongoing beach erosion.

Basics

Brazoria

N/A

Village of Surfside

$721,298

Classification

CEPRA

Shoreline Protection

Construction - Repair



Funding Sources

Source 1

Active

1573

Coastal Erosion Planning and Response Act (CEPRA)

Primary

State

$721,298

07,08

N/A


Back to Grant Search

Links to Additional Resources

Contacts

General Land Office
Coastal Resources
800.998.4456
512.475.0773