Bahia Grande Restoration Project, Phase III

Summary

The objectives of Phase III are to conduct post-construction monitoring of the main channel, control vehicle and pedestrian traffic for public safety and to protect sensitive habitat. Analysis and evaluation of project performance will be conducted using the data collected during the monitoring of the channel. Recommendations for maintenance and project modifications will be made to ensure the longevity of the project. The construction of a parking lot and fencing will control vehicular and pedestrian traffic which will provide public safety measures and mitigate damage to sensitive habitat in the area.

Basics

Cameron

N/A

N/A

$575,000

Classification

CIAP

Coastal Natural Hazards Response

N/A



Funding Sources

Source 1

Active

N/A

Coastal Impact Assistance Program (CIAP)

Primary

Federal

$575,000

2010

N/A


Back to Grant Search

Links to Additional Resources

Contacts

Cameron County
Joe E. Vega
Deputy Park Director
33174 Park Road 100-South
South Padre Island, Texas 78597
956.761.3700
956.761.5317 (FAX)
Email

General Land Office
800.998.4456
512.475.0773