Summary
The project includes engineering and design for a structure designed to protect the east side of Causeway Island from wind and wave erosion and will also trap and secure sediment from future dredge placement events. It is anticipated that the structure will be a minimum of 1,000 feet in length and positioned to protect the existing rookery habitat. This project will also include submitting an application for a U.S. Army Corps of Engineering Permit for the construction of the protection structure.
Basics
Nueces
N/A
Coastal Bend Bays & Estuaries Program
$140,000
Classification
- CEPRA
Shoreline Protection
Timeline
2018
Contacts
Coastal Bend Bays & Estuaries Program
Leo Trevino
512.361.0305
Email
General Land Office