Treasure Island MUD Shoreline Protection

Summary

This project is the construction of a shoreline protection structure (stone revetment) that connects the existing stone revetment terminating near the southeastern extent of Gulf Beach Drive into the CR257 bridge abutment. Additionally, a dune will be constructed over the revetment or directly behind it to enhance dune habitat.

Basics

Brazoria
N/A
Treasure Island Municipal Utility District
$1,000,000

Classification

  • CEPRA
Dune Restoration Habitat Restoration/Protection Shoreline Protection

Timeline

Contacts

General Land Office
Coastal Resources 800.998.4456 512.475.0773