Project Description
This project used the material dredged during routine maintenance dredging operations from the Sabine Pass channel section of the Sabine Neches Waterway and place it on the beach of Texas Point NWR to reduce the erosion rate, and to perhaps build some marsh.
Basics
Jefferson
U.S. Fish and Wildlife Service (USFWS)
5
Classification
CEPRA
- Marsh/Wetland Restoration or Protection
- Shoreline Protection
Contacts
Timeline
Completed
2013
Budget/Costs
$5025000.00
$0.00
$500000.00
$0.00
$4525000.00