Rockport Beach Harvey Repair

Project Description

This project mitigated damage from Hurricane Harvey to Rockport Beach by restoration of the beach to its pre-disaster design, function, and capacity by placement of 12,000 cubic yards of beach quality material along 4,680 feet of the engineered beach.

Basics

Aransas
Rockport
Texas General Land Office
10

Classification

CEPRA
  • Storm Damage Mitigation Project

Contacts

Timeline

Active