Project Description
The City of Port Lavaca repaired 184 linear feet of bulkhead and topped it with a concrete cap, and installed 350 linear feet of 6-foot-wide concrete walkway along the west end of the east wall of the bayfront peninsula.
Basics
Calhoun
City of Port Lavaca
10
Classification
CMP
306A
Public Access
Contacts
City of Port Lavaca Port Commission CEPRA #1059 w/ SD20010013
Gary Broz
Timeline
Closed
2007
Budget/Costs
$100,000.00