Project Description
This was a BMMP maintenance renourishment of the pedestrian beach at the Village of Surfside Beach.
Basics
Brazoria
Village of Surfside
7
Classification
CEPRA
Beach Nourishment
14-239-000-8332
1570
Timeline
Completed
2018
Contacts
Budget/Costs
$1700000.00
$0.00
$1700000.00
$0.00
$0.00