Surfside Emergency Beach Nourishment and Phase 3 Groin Engineering Alternatives Analysis

Project Description

This project was part of an emergency erosion response strategy to address the critical erosion of the gulf-facing shoreline adjacent to Beach Drive at the Village of Surfside.

Basics

Brazoria
Village of Surfside
6

Classification

CEPRA
  • Beach Nourishment
  • Dune Restoration
  • Shoreline Protection

Contacts

Timeline

Completed
2011

Budget/Costs

$8031818.50
$0.00
$513782.50
$0.00
$7518036.00