Project Description
Aransas First developed a master plan for the flood plain of the lower Tule Creek, installed interpretive signage, and constructed an approximate 20' X 30' partially covered pavilion connected to the existing viewing boardwalk.
Basics
Aransas
Aransas First
12
08-018-000-1199
Classification
CMP
306A
Public Access
Timeline
Closed
2009
Project Assets
Contacts
Budget/Costs
$57,730.04