Project Description
The Village of Surfside Beach will install four walkovers that enhance free public access to the drive on beach.
Basics
Brazoria
Village of Surfside Beach
4
Classification
CMP
306A
Public Access
Timeline
Closed
2000
Contacts
Budget/Costs
$6,386.63
